Professionnal experiements
In this section are detailled my personnal experiments since my internship at GRTgaz until my actual function as training responsible..
|
Novaxiom
Charge of training and recruitment
|
2015/Actually - 2 years
|
Training:

- Creation and implementation of training plans
- Writing training materials
- Employee training in:
- Automation (Siemens, Schneider, Rockwell, Emerson)
- Supervision (WinCC, Archestra, InTouch)

- Pharmacy (Standards, GAMP5, Batch, FMECA)
- Awareness of electrical risks
- Qualification of employees
- Technical monitoring of employees
Recruitment:
- Tracking applications
- Qualifications of candidate profiles
- Technical and human interviews
Technical support:
- Technical support for employees during missions
- customer troubleshooting, maintenance contracts, interventions on site.
|
Bledina for the account of 
Project Engineer - Process Control
|
2014/2015 - 1 year
|
Adding a new production line in the existing plant
Achievements:
- Project management, team management (4 people) and customer relationsip
- Writting fonctionnal specifications
- Automation code developpement with Siemens PCS7 V8
- Human Machine Interface developpement with Siemens WinCC
- Internal tests, FAT and commissioning
Keys competences:

- Automation PCS7 developpement
- HMI WinCC developpement
- Project management
|
Eurotherm for the account of 
Project Engineer - Process Control
|
2013/2014 - 3 months
|
Graphic interface developpement for configuration and monitoring of Eurotherm regulators Nanodac
Achievements:
- Developpement under Wonderware Archestra system plateform 2012
- Reports management with Dreamreport and SQL requests
- Internal tests and commissionning
Keys competences:
- Wonderware HMI developpement
|
Boccard for the account of 
Project Engineer - Process Control
|
2013 - 3 months
|
Achievements:
- Developpement under Wonderware Archestra system plateform 3.5
- Depoying on client test plateform
Keys competences:
- Wonderware HMI developpement
|
SPIE for the account of 
Project Engineer - Process Control
|
2013 - 3 months
|
Partnership with client for CIP system management
Achievements:
- Project management and customer relationsip
- InBatch establishment and developpement of a communication interfacedans into the PLC (Schneider)
- Internal tests, FAT and commissionning
Keys competences:

- MES InBatch system establishment
- Schneider Automation developpement
- Autonomy
|
Cargill for the account of 
Project Engineer - Process Control
|
2013 - 3 months
|
Evolving of many production line
Achievements:
- Project management and customer relationsip
- Automation code developpement (Siemens S7)
- Communication between PLCs
- Internal tests, FAT and commissionning
Keys competences:
- Step7 Developpement
- Autonomy
|
BASF Agri for the account of 
Project Engineer - Process Control
|
2012 - 6 months
|
Support for a project of agricultural products production
Achievements:
- Project management and customer relationsip
- Human Machine Interface developpement (
Archestra)
- InBatch establishment and developpement of a communication interfacedans into the PLC (Schneider)
- Internal tests and FAT
- Commissioning
Keys competences:

- Human Machine Interface developpement -

- MES InBatch system establishment
- Schneider Automation developpement
- Autonomy
|
Novasep Process for the account of 
Project Engineer - Process Control
|
2011/2012 - 6 and 2 months
|
Support for two projects of food product handling
Achievements:
- Project management, team management (2 people) and customer relationsip
- Automation code developpement (Siemens S7) and Human Machine Interface (WinCC et WSP / InTouch) for:
- 4 mecanical micro-filtration units + Cleaning phases
- 2 chemical separation units
- 2 demineralization units
- Internal tests and FAT
- Commissioning(China)
Keys competences:


- Step7 Developpement
- Human Machine Interface -
and Siemens 
- Autonomy
|
Alstom Transport for the account of 
Validation Engineer
|
2011 - 6 months
|
Validation of embedded software on rail cars
Achievements:
- Development and compilation of tests environment under QNX and Linux
- Test automation recurring and non-regressive
|
Erec Technologies for the account of 
Automation engineer
|
2010 - 2 months
|
Developpement, updates and installation of air conditioning automatons
Achievements:
- Development of Siemens automatons for the management of handling air centrals, air conditioning systems and boilers
- Development of part of the supervision operator -

- Commissioning of processing automatons and starting concerned items
Keys competences:
- Step7 Developpement
- Supervision -

- Autonomy
|
Ineo Tinea for the account of 
Writter
|
2010 - 3 months
|
Writting of tests sheets about an automated naturral gaz compression station
Achievements:
- Detailled study of an automated naturral gaz compression system through detailled functionnal analysis, organic analysis and automaton code
- Writting of unitary, functionnal and integration tests documents
|
Idle time
|
2009 - 3 months
|
Answer to tenders : Urbanization et Unit tests, researches about web hosting
Achievements:
- Study customer needs
- Study necessary's skills
- Project plans
- Writing the response document
- Feasibility study of the internal mail, website and Intitek tools hosting
|
Renault Trucks for the account of 
Consultant Engineer
|
2009 - 3 months
|
Deploying the update of the diagnostic tool truck
Achievements:
- Selection of potential pilot dealers for the new trial version.
- Canvassing of selected dealers.
- Delivery and installation of the new version in dealerships.
- Usage tracking and recovery notes, problems and bugs from dealers
Keys competences:
- Organizational skills
- Writing qualities
- Communication with different contacts
|
Siemens for the account of 
Automation Engineer
|
2008/2009 - 10 months
|
Standardizing the planer product
Target / Project Scope:
In an effort to reduce development time and commissioning of planers, I participated in the standardization of the PLC program incorporating the most used features in most projects.
Achievements:
- Defining standard features of the reference product: 90% of the functions used in 90% of projects underway or planned.
- Defining a development plan and a management tracking bugs and changes
- Writting technical specifications
- Collaborations with project teams
- Siemens PLC programming with the SIMATIC PCS7 toolkit
- Human-Machine Interface developing with WinCC
- Software simulation developing
- Functionnal testing
Technical Environment / Keys competences:
- Project management
- PCS7 Siemens developement
- WinCC Human-Machine Interface
- 5S Standard
- Relational
|
Sagem for the account of
Unit Tests Engineer
|
2008 - 3 months
|
Embeded C code unit tests
Target / Project Scope:
In an effort to validate the A380 embeded C code integrity, I participated in unit testing of software control of differents network communication equipment of the A380.
Achievements:
- Analysis of sources code, their architectures and specifics
- Sources code compilation with DIAB DATA (cross compiler)
- Conception, developement and execution of scenarii test with

- Automated generation of tests reports
- Formatting test reports for customer delivery
Technical Environment / Keys competences:
- C code

- Safe Environment (C level of D0178B standard)
- Analytical / Self / Essence
|
Volvo Powertrain for the account of 
Hardware Installer
|
2007 - 6 months
|
Validation of electronics components installation
Target / Project Scope:
To overcome the potential problems faced by embedded computers and components for industrial vehicles, Volvo makes sure that equipments are installed according to manufacturers specifications by performing laboratory tests and running tests.
Achievements:
- Validation of electronic components installation on trucks engine.
- Centering and coordination of temperature and vibration tests.
- Establishing records from these elements to guarantee the components from suppliers
Technical Environment / Keys competences:
- Relational
- English
- Organisation
|
Master's degree Internship
|
2007 - 6 months
|
Design of an electronic display board LED
Target / Project Scope:
- Design of a new electronic display board LED.
- Improvements from the previous version about light output and wear.
Achievements:
- Study of the former existing product, evaluation of defects and problems: about 1 month
- Search for new components and new solutions to bring: about 2 months
- Design and prototyping: about 1 month
- Study of the existing program in the processing card, adaptation of the program with the new developed code: about 2 months
Technical Environment / Keys competences:
- PIC assembler developement with MPLab IDE
- Electronic
- Routing
- Creativity / Self / Essence
|
BTEC Internship
|
2004 - 3 months
|
Programmation of PLC monitoring
Target / Project Scope:
- PLC programming for the supervision of decompression gas stations.
Achievements:
- Study of natural gas decompression station and the constituent materials.
- Programmation of PLC monitoring (TBox) for the control and command of these stations.
- Communication monitoring center by Modbus protocol.
- Functional testing on laboratory, on station and in real operation.
Technical Environment / Keys competences:
- Ladder programming with TwinSoft
- Modbus communication
- Wiring
- Self / Essence